OATdb Archive

2007 - 2008

Management Information Systems BBA

Goal
Management Information Systems Student Satisfaction
Management Information Systems students will be satisfied with instruction they receive.

Objective
MIS-Comparison With Aspirant Schools
Management Information Systems students will be as satisfied with the level of instruction they received as students that attended six aspirant schools.

Indicator
MIS-Educational Benchmarking Inc- Undergraduate Business Exit Assessment
Opinions of Management Information Systems student on the EBI- Undergraduate Business Exit Assessment.

Criterion
Management Information Systems Comparison
The Management Information Systems program mean will be no greater than .5 below the six aspirant school comparison group mean.

Finding
Managemet Information Systems Program
The Management Information Systems average was greater than the six aspirant schools comparison group.

Action
MGT Info Systems-Higher Caliber Assessment Tools
We are pleased with the findings and will continue to measure the perceptions of our students.

Goal
Management Information Systems- A Broad Base Of Knowledge
The goal of the BBA program in Management Information Systems is to provide students with a broad base of knowledge in the Management Information System discipline. 291,388,379,390,431,485.

Objective
Information Systems
Students who complete the BBA in Management Information Systems will demonstrate an understanding of basic computer technology concepts and the development and use of information systems in organizations. 388

Indicator
Information Systems Pre-Test And Post-Test
Assessment will be made using pre-test and post-test performance on basis computer technology concepts.388

Criterion
Information Systems: Improvement on Post-Test Scores
Students will average at least a 50% improvement over the pre-test. The class average on individual post-test questions will be 75% correct. Post-test questions will be included on each unit examination. 388

Finding
Information Systems Findings
Students averaged a 136% improvement over the pre-test. The class average on individual post-test questions is 68%. Please see attachment.

Action
Info Systems
While the students improved their performance over the pre-test scores, they fell short on the post-test average by 7 percentage points. The faculty involved with this objective will investigate the criteria and performance. We will also search for alternative ways to assess this objective.

Objective
Programming
Students who complete the BBA in Management Information Systems will demonstrate the ability to analyze and define business problems from a programming perspective and an understanding of the basic concepts of programming, problem solving, and program logic. 291

Indicator
Programming Pre-Test, Post-Test, And Rubric
Assessment will be made using pre-test and post-test performance on defining business problems from a programming perspective and the basic concepts of programming, problem solving, and program logic. A rubric will be used to assess programming skills. 291

Criterion
Programming: Improvement on Post-Test and Rubric Scores
Students will average at least a 50% improvement over the pre-test. The class average on individual post-test questions will be 75% correct. Post-test questions will be included on each unit examination Seventy five percent of Management Information Systems majors will receive a score of at least acceptable on the Management Information Systems rubric. 291

Finding
Programming Findings
This objective was not assessed in 2007-08.

Action
Programming Actions
This objective should be assessed in 2008-2009.

Objective
Systems Analysis And Design
Students who complete the BBA in Management Information Systems will demonstrate an understanding of the design and application of information systems in business and a knowledge of the tools and processes used in systems analysis and design. 379

Indicator
Systems Analysis And Design Pre-Test, Post-Test, And Rubric
Assessment will be made using pre-test and post-test performance on the design and application of information systems and the tools and processes used to achieve such designs. A rubric will be used to assess skills in systems analysis and design.379

Criterion
Systems Analysis and Design: Improvement on Post-Test and Rubric Scores
Students will average at least a 50% improvement over the pre-test. The class average on individual post-test questions will be 75% correct. Post-test questions will be included on each unit examination Seventy five percent of Management Information Systems majors will receive a score of at least acceptable on the Management Information Systems rubric. 379

Finding
Systems Analysis and Design Findings
This objective was not assessed in 2007-08.

Action
Systems Analysis & Design
This objective should be assessed in 2008-2009.

Objective
Database
Students who complete the BBA in Management Information Systems will demonstrate an understanding of the design and implementation of database applications and how database software works and its inclusion in design solutions. 390

Indicator
Database Pre-Test, Post-Test, And Rubric
Assessment will be made using pre-test and post-test performance on design and implementation of database applications and how database software works. A rubric will be used to assess skills in using database software. 390

Criterion
Database: Improvement on Post-Test and Rubric Scores
Students will average at least a 50% improvement over the pre-test. The class average on individual post-test questions will be 75% correct. Post-test questions will be included on each unit examination Seventy five percent of Management Information Systems majors will receive a score of at least acceptable on the Management Information Systems rubric. 390

Finding
Database Findings
Students averaged a 151% improvement over the pre-test. The class average on individual post-test questions is 74%. Please see attachment.

Action
Database MGT
The criteria were not met. The faculty involved with this objective will investigate the criteria and performance. We will search for alternative ways to assess this objective.

Objective
Electronic Commerce
Students who complete the BBA in Management Information Systems will demonstrate the ability to implement business oriented systems for electronic commerce and skills in using Internet technologies. 431

Indicator
Electronic Commerce Pre-Test And Post-Test
Assessment will be made using pre-test and post-test performance on business oriented systems.431

Criterion
Electronic Commerce: Improvement on Post-Test Scores
Students will average at least a 50% improvement over the pre-test. The class average on individual post-test questions will be 75% correct. Post-test questions will be included on each unit examination. 431

Finding
Electronic Commerce Findings
Students averaged a 680% improvement over the pre-test. The class average on individual post-test questions is 78%. Please see attachment.

Action
E Commerce
The criteria were met. We will search for alternative ways to assess this objective.

Objective
Networking
Students who complete the BBA in Management Information Systems will demonstrate an understanding of telecommunications services and networking technologies and skills in installing and managing networks within business organizations. 485

Indicator
Networking Pre-Test, Post-Test, And Rubric
Assessment will be made using pre-test and post-test performance on understanding of telecommunications services and networking technologies. A rubric will be used to assess skills in installing and managing networks. 485

Criterion
Networking: Improvement on Post-Test and Rubric Scores
Students will average at least a 50% improvement over the pre-test. The class average on individual post-test questions will be 75% correct. Post-test questions will be included on each unit examination Seventy five percent of Management Information Systems majors will receive a score of at least acceptable on the Management Information Systems rubric. 485

Finding
Network Findings
This objective was not assessed in 2007-08.

Action
Networking Actions
This objective should be assessed in 2008-2009.


Update to previous cycle's plan for continuous improvement

Plan for continuous improvement