Goal
University Image And Exposure
President's goal to improve campus image and exposure

Objective
Conduct Shop Operations Safely
The department will conduct its shop operations in a safe manner to minimize University exposure to high workers compensation claims.

Indicator
Worker's Compensation Injuries For Physical Plant Employees
Accident reports for reportable injuries (lost time) are filed with the Safety Office as well as Human Resources and State offices. (Summary logs are attached at the Indicator level.)

Criterion
Zero Reportable Accidents in the Physical Plant
Physical Plant has set zero reportable accidents as the target for this criteria.

Finding
Four Worker's Compensation injuries in FY 2007.
There were four (4) Worker's Compensation injuries reported for fiscal year 2007.

Finding
Custodial Shop reported 75% of injuries.
Seventy-five (75%) of the Worker's Compensation injuries in 2007 were reported for the Custodial shop.

Finding
Significant drop in injuries for FY 2007.
There was a significant drop in injuries for 2007 from fiscal years 2005 and 2006.

Finding
Custodial incidents involve personal protective eq
The Custodial Shop incidents involve incorrect use or non-use of personal protective equipment (PPE).

Action
Establish additional duty Safety Coordinators.
Establish additional duty Safety Coordinators in each shop.

Action
Compile list of duties for Safety Coordinators.
A list of duties will be compiled for each of the Shop Safety Coordinators.

Action
Department Safety Coordinator assist in training.
The Department Safety Coordinator will assist each Shop Safety Coordinator with training activities.

Action
Increase awareness of continuous improvement.
Increase the department's awareness of this Continuous Improvement Program.

Action
Focus on PPE training in the Custodial Shop.
Focus training in the Custodial Shop on the use of personal protective equipment (PPE).

Goal
Effectively Use Department Resources
Effectively manage and use the available hours of our department employees.

Objective
Maximize Productivity Of Shop Employees
To maximize the number of daily hours assigned to a specific task or work order. To increase productivity of the work force.

Indicator
MP 2 Reports Of Hours Logged And Hours Available
MP 2 Reports of hours logged and available hours will be used to prepare productivity reports. (Reports attached at the Indicator level.)

Criterion
Achieve 80% Productivity for the Department
Criteria is to achieve an overall 80% productivity level for the department.

Finding
Department productivity exceeds criteria
Department productivity for 2006-2007 was 83.5% which exceeds the criteria of 80%.

Finding
5 shops need help in raising productivity
5 shops ended the fiscal year with productivity levels below 80% and will need assistance in bringing there production numbers up.

Action
Improve employee logging of hours worked
Employees often do not log all their hours on work orders. The process of allotting hours to work hours will have to be studied and improved to raise shop productivity.

Goal
Energy Conservation
To comply with Governor's Energy Conservation Program by achieving internal goals.

Objective
Reduce The Use Of Energy In Campus Buildings
Physical Plant will support the Governor's Energy Program by establishing energy reduction goals for campus buildings and initiating programs to reduce energy.

Indicator
Z-Power Total Energy Consumption Reports And Gross Square Feet Inventory Reports
Total campus energy consumption per square foot will be calculated using Z-power energy consumption reports and building inventory reports. (Reports are attached at the indicator level.)

Criterion
Reduce Total Campus Energy Consumption Per Gross Square Foot by 1% Annually Below FY2005
Energy consumption is measured in 1000 British Thermal Units or KBTU's. Gross square feet (GSF) of energy is derived from the campus building inventory. This measurement is the ratio of KBTU's per GSF.

Finding
FY2007 Campus Energy Consumption increased 3.7%.
The total FY2007 campus energy consumption per gross square foot increased 3.7%. Electrical consumption increased 9.6% compared to FY2005 and Natural Gas consumption increased 45% compared to FY2005.

Finding
Meeting energy goal affected by NAG usage
1. Increased campus square footage.
2. A natural leak was discovered on the Library/Smith-Hutson line resulting in an increased consumption for December, January, and February of approximately 1,643 mcf.
3. The West Central Plant loop system had numerous leaks and has been converted to central hot water.
4. The Farrington boiler system controls were accidently changed to manual resulting in an increased consumption of approximately 576 mcf.

Finding
Meeting energy goal affected by Elec usage
1. Unexplained distribution line losses.
2. The campus added 422,209 sp. ft.
3. Raven Village, a housing facility for 409 students, opened adding an average consumption increase of 140,464 Kwh.
4. The John R. Ragsdale Visitor and Alumni Center, a 12,809 sp. ft. building with kitchen facilities to accommodate visitor and alumni functions, opened.

Action
Continue to monitor campus energy consumption.
Continue to monitor campus energy consumption and building operations.

Action
Implement a monthly utility billing statement.
Develop and implement a monthly utility billing that will inform departments of cost and consumption to promote campus energy consumption awareness.

Action
Establish Energy Efficiency Committee
Establish an Energy Efficiency Committee in the Physical Plant Department.

Action
Use services of an Energy Performance Contractor.
Contract services of an Energy Performance Contractor.

Action
Identify buildings with high utility cost.
Identify campus buildings with high utility cost and conduct energy audits.

Action
Establish an energy conservation plan.
Establish an energy conservation plan as required by Executive Order RP-49 of the Governor's Office.

Action
Construct Energy Efficient Buildings
Ensure university facilities are designed, constructed, and renovated in accordance with energy conservation.

Action
Evaluate energy monitoring and control systems.
Evaluate additional metering needs and control points to the existing energy monitoring and control system.

Objective
Improve Average Fuel Economy Of Campus Vehicles
Physical Plant will support the Governor's Energy Program by establishing energy reduction goals for campus vehicles and initiating programs to reduce energy.

Indicator
Spreadsheet Of Fleet Miles Per Gallon Numbers
Fleet Focus reports on mileage and fuel consumption will be used to produce fleet miles per gallon reports. (Reports attached at the Indicator level.)

Criterion
Improve Annual Vehicle Miles Per Gallon by 1% Above FY 2005
Total vehicle miles driven annually for FY 2007 and total gallons of vehicle fuel consumed will be calculated from Fleet Management Reports. The ratio of miles per gallon (MPG) will be calculated for FY 2007 and compared to FY 2005

Finding
Vehicle Reports From Some Depts Late & Inaccurate
The vehicle data reporting from some departments is frequently late and inaccurate.

Finding
Overall Decline in MPG Across SHSU Vehicle Fleet
There has been an overall decline in mpg across the SHSU vehicle fleet from FY05 to FY07.

Finding
Fuel Purchased Away From SHSU Difficult to Track
Fuel purchased for SHSU vehicles away from the SHSU fueling facility, unless purchased with a SHSU fuel card, is difficult to track and apply to the proper vehicle and is sometimes missed altogether.

Finding
MPG Decline Partially Due to Lower MPG Rated SUVs
The mpg decline can be partially attributed to the replacement of sedans with lower mpg rated wagons and SUV's.

Finding
MPG Decline Also Due to New Full Size SUVs
The mpg decline can also be attributed to new vehicle allocations to the SHSU fleet being filled with full size SUV's, such as Expeditions and Excursions, which have a low mpg rating.

Action
Pursue Better Cooperation From Depts in Reporting
Pursue better cooperation from departments in accurate and timely reporting of vehicle mileage and fuel data.

Action
Perform Evaluation of MPG on Additional Criteria
Perform further evaluation of vehicle mpg data based upon department, function, and other possible criteria.

Action
Evaluate Vehicle Assignments for Replacement Types
Evaluate vehicle assignments to determine if vehicles can be replaced with higher mpg rated vehicles or alternate fuel vehicles.

Action
Install Vehicle Tracking Equipment
Install vehicle tracking equipment and evaluate resulting information for possible reductions in stops, idling, or alternate routing.

Action
Recommend Vehicles Be Replaced With Higher MPG
Recommend that vehicles scheduled for deletion be replaced with higher mpg rated vehicles or alternate fuel vehicles.

Goal
Response To Customers
Respond to customer work requests in an effective and timely manner.

Objective
Minimize Response Time To Repair Work Orders.
This objective is to minimize the shop response time to unscheduled repair work orders.

Indicator
MP 2 Completed Work Order Reports
MP 2 completed unscheduled repair work orders will be generated to determine days to complete work orders. (Reports attached at the Indicator level.)

Criterion
10 Days or Less Average Completion Time for Unscheduled Repair Work Orders
All shops and the department will strive for 10 days or less to accomplish unscheduled repair work orders.

Finding
Department did not meet WO completion goal
In 5 of the months in FY 2007 the department had greater than 10 day average completion time on unscheduled repair work orders

Finding
Several shops must improve WO completion time
Auto, HVAC, Paint, Parking, and Welding shops require further effort to meet the criteria.

Finding
Improve WO comp time by focus on aging WOs
Shops are not using resources to single out aging work orders to concentrate labor as needed.

Finding
Three shops met 10 or less days WO completion time
Carpenter shop, Lock shop, and Plumbing shop had one or less months where they did not average less than 10 days completion time on unscheduled repair work orders.

Finding
Improve WO comp time by making temp repairs
Immediate repairs should result in closed work order. New work order with new classification should be opened to complete future work if needed.

Finding
Improve WO comp time by use of correct WO type
Some work orders are incorrectly identified as unscheduled repairs versus other work order types. This could divert hours away from some repairs to service or scheduled work of lowere priority.

Finding
Improve WO comp time by correct shop assignment
Work orders are often not assigned to the correct shop while discussions continue for lengthy periods on who or how the work will be done.

Action
Maintain criteria of 10 days average completion
Criteria of average 10 days to complete unscheduled repair work orders will be extended to FY 2008

Action
Issue commendation ltrs to shops meeting criteria
Prepae letters of commendation to three shops who satisfactorily achieved the critera. Lock, Carpenter, and Plumbing shops.

Action
Improvement letters to shops not meeting criteria
Issue letters of improvment to all shops not meeting criteria. Paint, Parking, Welding, HVAC, Electrical, Auto shops.

Action
Distribute actions for improvement
Create a list of actions shops can take to improve their time of completion for work orders.

Action
Weekly list of work orders not meeting criteria
A weekly list of work orders not meeting the criteria will be sent to shops for comments and return to the Director.

Goal
Improve The Knowledge Of Department Employees
Continuous improvement of employee work related knowledge to increase work output and improve work quality.

Objective
Send Employees To Conferences And Training Classes
Physical Plant will send employees to conferences and classes to improve work output and work quality skills.

Indicator
Training Database Reports
Report totals run from the department's Training Database will be used to measure results of this objective. (Reports have been attached at the Indicator level.)

Criterion
12 or More Employees Will Attend Conferences or Training Programs
12 or more of our employees will attend skills or knowledge improvement conferences or training programs.

Finding
Trained 26 employees in 2007.
Although fiscal year 2006 showed the highest number of employees trained, we still exceeded our goal of 12 employees on each year evaluated (approximately 7% of department employees).

Finding
Boiler training is 72% of 2005 training costs.
A three day boiler operator's training for two employees was 72% of training costs in 2005.

Finding
Asbestos training is not captured every year.
Asbestos removal refresher training for all six members of the O&M Team was recorded in 2006. Although, these refresher courses are required annually, they were not documented for 2005 or 2007.

Finding
No IN-HOUSE departmental training offered in 2007.
No IN-HOUSE one hour departmental training offered in 2007 caused the decrease in number of employees trained for that year.

Action
Improve process for capturing training information
Improve the process for capturing training data by expanding the database to include categores of training and obtaining feedback from trainees.

Action
Track types of training utilized.
By tracking the types of training taken during the fiscal year, we can determine what types of training is being utilized and what types of training is not being taken advantage of but should be.

Action
Expand benefits of training.
Expand benefits of one individual's training by sharing learned skills to members of the entire shop or a combination of shops.

Action
Identify areas of little or no training.
Identify shops that have low training numbers and determine the causes.

Action
Design training summary sheet.
Design a summary sheet of learnings to be filled out by each employee following a training session.

Action
Introduce more IN-HOUSE training programs.
Utilize knowledge and skills of department employees to address some of the training needs identified by database report findings, foreperson input, and training requests.

Action
Change criteria to train 20% of employees.
We will increase our training criteria to 20% or more of department employees in fiscal year 2008.


Update to previous cycle's plan for continuous improvement

Plan for continuous improvement